Results 1 to 1 of 1

Thread: Ministry of Water Resources - Availability and Potential - PLAN-WISE POSITION OF IRRIGATION POTENTIAL CREATED AND UTILISED.

  1. #1
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Ministry of Water Resources - Availability and Potential - PLAN-WISE POSITION OF IRRIGATION POTENTIAL CREATED AND UTILISED.

    Ministry of Water Resources

    Availability and Potential


    PLAN-WISE POSITION OF IRRIGATION POTENTIAL CREATED AND UTILISED
    (In million hectares)
    Plan
    Potential created Potential utilised
    Major & Minor TOTAL Major & Minor TOTAL
    Medium S.W. G.W. Total Medium S.W. G.W. Total
    (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
    Upto 1951(Pre-Plan) Cumulative 9.70 6.40 6.50 12.90 22.60 9.70 6.40 6.50 12.90 22.60
    I Plan (1951-56) During 2.50 0.03 1.13 1.16 3.66 1.28 0.03 1.13 1.16 2.44
    Cumulative 12.20 6.43 7.63 14.06 26.26 10.98 6.43 7.63 14.06 25.04
    II Plan(1956-61) During 2.13 0.02 0.67 0.69 2.82 2.07 0.02 0.67 0.69 2.76
    Cumulative 14.33 6.45 8.30 14.75 29.08 13.05 6.45 8.30 14.75 27.80
    III Plan (1961-66) During 2.24 0.03 2.22 2.25 4.49 2.12 0.03 2.22 2.25 4.37
    Cumulative 16.57 6.48 10.52 17.00 33.57 15.17 6.48 10.52 17.00 32.17
    Annual Plans (1966-69) During 1.53 0.02 1.98 2.00 3.53 1.58 0.02 1.98 2.00 3.58
    Cumulative 18.10 6.50 12.50 19.00 37.10 16.75 6.50 12.50 19.00 35.75
    IV Plan (1969-74) During 2.60 0.50 4.00 4.50 7.10 1.64 0.50 4.00 4.50 6.14
    Cumulative 20.70 7.00 16.50 23.50 44.20 18.39 7.00 16.50 23.50 41.89
    V Plan 1974-78) During 4.02 0.50 3.30 3.80 7.82 2.77 0.50 3.30 3.80 6.57
    Cumulative 24.72 7.50 19.80 27.30 52.02 21.16 7.50 19.80 27.30 48.46
    Annual Plans (1978-80) During 1.89 0.50 2.20 2.70 4.59 1.48 0.50 2.20 2.70 4.18
    Cumulative 26.61 8.00 22.00 30.00 56.61 22.64 8.00 22.00 30.00 52.64
    VI Plan (1980-85) During 1.09 1.70 5.82 7.52 8.61 0.93 1.01 4.24 5.25 6.18
    Cumulative 27.70 9.70 27.82 37.52 65.22 23.57 9.01 26.24 35.25 58.82
    VII Plan (1985-90) During 2.22 1.29 7.80 9.09 11.31 1.90 0.96 6.91 7.87 9.77
    Cumulative 29.92 10.99 35.62 46.61 76.53 25.47 9.97 33.15 43.12 68.59
    Annual Plans(1990-92) During 0.82 0.47 3.27 3.74 4.56 0.85 0.32 3.10 3.42 4.27
    Cumulative 30.74 11.46 38.89 50.35 81.09 26.31 10.29 36.25 46.54 72.85
    VIII Plan(1992-97) During 2.21 1.05 1.91 2.96 5.17 2.13 0.78 1.45 2.23 4.36
    Cumulative 32.95 12.51 40.80 53.31 86.26 28.44 11.07 36.76 47.83 76.27
    IX Plan(1997-2002) During 4.10 3.59 3.59 7.69 2.57 1.22 1.22 3.79
    Cumulative 37.05 16.10 56.90 93.95 31.01 18.04 49.05 80.06
    SW: Surface Water; GW:Ground Water
    Last edited by ca_news; 27-06-2011 at 12:43 PM.

Tags for this Thread

Bookmarks

Posting Permissions

  • Register / Login to post new threads
  • Register / Login to post replies
  • Register / Login to post attachments
  • You may not edit your posts
  •