Page 2 of 2 FirstFirst 12
Results 11 to 11 of 11

Thread: Ministry of Water Resources - Repair , Renovation and Restoration of water bodies - Guidelines for RRR of Water Bodies with Domestic Support.

  1. #11
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Guidelines for repair, renovation and restoration of water bodies with domestic support - Annexure-III.

    Guidelines for repair, renovation and restoration
    of water bodies with domestic support


    Annexure-III

    The Check List for processing the release of funds by the Ministry of Water Resources

    Sl. No.
    Item


    Yes/No

    1 Whether census of water bodies completed and assigned unique code number?
    2 Whether only water bodies having CCA upto 2000 hectare included?
    3 Are private water bodies included in the DPR?
    4 Whether concerned stakeholders including panchayats have been associated for selection of water bodies and capacity building?
    5 Whether water bodies are included in the district plan?
    6 Whether rain fall data for last 10 years, ground water level, land use pattern, water quality situation in the water bodies and adjoining areas have been included?
    7 Whether details of original CCA/present CCA/CCA expected after rejuvenation have been included?
    8 Whether details of original storage capacity/present storage capacity and storage capacity expected after rejuvenation have been included?
    9 Whether maps of catchment and command are enclosed?
    10 Whether benefit cost ratio has been incorporated?
    11 Whether implementation schedule and corresponding requirement of funds, details of arrangements for monitoring and evaluation has been included?
    12 Whether convergence with NREGS or other schemes have been taken into account?
    13 Whether DLI&MC has been constituted?
    14 Whether District Level Implementing Agency has been identified?
    15 Whether State Level Nodal Agency has been identified by the State government?
    16 Whether Technical Advisory Committee has been constituted?
    17 Whether the DPR has been approved by TAC?
    Last edited by ca_news; 29-06-2011 at 06:21 PM.

Tags for this Thread

Bookmarks

Posting Permissions

  • Register / Login to post new threads
  • Register / Login to post replies
  • Register / Login to post attachments
  • You may not edit your posts
  •