    Repair , Renovation and Restoration of water bodies

    Guidelines for repair, renovation and restoration of water bodies with external assistance

    Government of India
    Ministry of Water Resources
    2009


    1. INTRODUCTION


    1.1 Water Bodies have traditionally played an important role in irrigation, drinking water supply, hydropower ecology, tourism/culture and domestic use.

    However, the relative importance of some of these water bodies has waned. Government of India approved a scheme for Repair, Renovation and Restoration of Water Bodies with external assistance as a state sector scheme. The scheme will be applicable in whole of the country and details are outlined in succeeding paras.

  2. #2
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Guidelines for repair, renovation and restoration of water bodies with external assistance - Basic Features of the Scheme.

    Guidelines for repair, renovation and restoration of water bodies with external assistance

    2. Basic Features of the Scheme:

    2.1 Under the scheme, about 23,000 water bodies having a Culturable Command Area (CCA) of 16.8 lakh ha. at a cost of Rs. 6,000 crore including central share of Rs.1500 crore are to be covered. The main objectives of the scheme are:

    (i) Comprehensive improvement of selected tank systems including restoration.
    (ii) Improvement of catchment areas of tank.
    (iii) Community participation and self-supporting system for sustainable management for each water body.
    (iv) Ground Water Recharge.
    (v) Capacity Building of communities, user groups, standing committees for Panchayats and State Government/Central Government Agencies concerned with the planning, implementation & monitoring of the projects.
    (vi) Increase in storage capacity of water bodies.
    (vii) Improvement in agriculture/horticulture productivity and increase in recharge of ground water in downstream areas of water bodies.
    (viii) Environmental benefits through improved water use efficiency; irrigation benefits through restoration of water bodies; supplementation of the groundwater resource and promotion of conjunctive use of surface and ground water.
    (ix) Development of tourism, cultural activities, etc.
    (x) Increased availability of drinking water.

    2.2 The funding pattern for the scheme is given below:

    (i) States may take up the projects for funding under External Assistance, wherein 75% is loan taken by the Government of India from the World Bank and is passed on to the concerned States on back to back basis and is to be repaid by the States. The balance 25% loan is taken as liability of Government of India and passed on as Additional Central Assistance (100% grant) to the states for the projects.

    (ii) Tentative allocation for sub-components of the projects is indicated hereunder:
    a) Catchments treatment: 15-20%
    b) Repair of sluices, weirs, bunds, desilting, etc: 60-65% (desilting not to exceed 25%)
    c) Command Area Treatment: up to 25%.
    d) Capacity building, awareness campaign and institutional support; upto 10%.
    e) Strengthening of implementation mechanism and impact assessment through independent agencies by Ministry of
    Water Resources (MoWR); 5% of the central grant.

    (iii) Release of additional central assistance to the States as per agreement with the World Bank.

    (iv) States will send Utilization Certificate to the Government of India (GOI) in the prescribed Proforma for release of installments.

    (v) The Audited Account from the State for the project works is to be submitted to the GOI as per established procedure.

  3. #3
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Guidelines for repair, renovation and restoration of water bodies with external assistance - Planning of the Projects under the Scheme.

    Guidelines for repair, renovation and restoration of water bodies with external assistance

    3. Planning of the Projects under the Scheme:

    The states may take up planning and implementation of projects under the scheme generally in the manner outlined below:

    3.1 Identification and selection of water bodies:

    (i) A project may be prepared for an individual water body or for a group of water bodies with sub-basin approach. All public and community owned water bodies may be covered under the project. All water bodies included in the project will be given a unique code number. States will accordingly undertake census of these water bodies and get complete list of water bodies along with unique code in the first stage.

    (ii) The implementing agency at the field level should hold discussions with the standing committee of the Panchayat at the appropriate level in process of identifying water bodies for repair, renovation and restoration.

    (iii) The States may take up the repair, renovation and restoration of water bodies having a minimum of 20 hectare original irrigation culturable command area and up to 2000 hectare, for drinking water, irrigation, pisciculture, tourism, ground water recharge or any other purposes.

    (iv) Private owned water bodies are not to be considered for funding under this scheme.

    3.2 Preparation of Detailed Project Reports (DPR):

    The DPR of a project has to include information on the following aspects:

    3.2.1 Details of present status of the water bodies (in use or partially used or not in use) with reasons for deterioration in condition.

    3.2.2 Rainfall during the last ten years, ground water level, land use pattern, soil characteristics, climate conditions, availability of water in the catchment area for channelization into water body, water quality situation in the water body and adjoining areas.

    3.2.3 Details of original CCA, present CCA and CCA planned in the DPR, original storage capacity/present storage capacity and storage capacity planned in the DPR, incidence of poverty, water quality situation in the water body and of ground water in adjoining areas with likely impact of the project on water quality of the water body and of the ground water.

    3.2.4 Scope of work –

    Scope of work in the DPR may include the following:-
    De-silting in terms of quantum of silt to be removed, repair of conveyance system, strengthening of bund(s), repair of weirs and sluices, catchment treatment, command area development, soil erosion prevention works, quality control measures. Maps of catchment and command areas are to be enclosed in the DPR.

    3.2.5 The scheme envisages capacity building of implementing agencies such as Ministry of Water Resources (MoWR) and its attached and subordinate offices, State Governments, District Implementing agencies, Water Users’ Associations (WUAs) and Panchayats. Accordingly, a capacity building programme aimed at sensitization of stakeholders in consultation with the “Standing Committee of Gram Panchayat on Water Resources”, identification and selection of water bodies, preparation of Detailed Project Reports (DPRs), monitoring and evaluation is to be prepared and included in the DPRs.

    3.2.6 Targetted benefits under the project will include creation of additional irrigation potential, Increase in agriculture/horticulture/pisciculture production and productivity, increase in recharge of ground water, improvement in water use efficiency, increase in availability of drinking water, impact on water quality, promotion of tourism and culture.

    3.2.7 Benefit Cost ratio (BC ratio) has to be minimum 1:1 in Special Category States, undivided KBK districts of Orissa, in drought prone, tribal and naxal-affected areas and 1.5:1 in other areas.

    3.2.8 Implementation schedule & corresponding requirement of funds; details of arrangement for monitoring & evaluation and of arrangement for use and maintenance of the restored water bodies.

    3.2.9 Implementing agencies will take measures to ensure convergence with other related schemes.

  4. #4
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Guidelines for repair, renovation and restoration of water bodies with external assistance - Implementation of the Scheme.

    Guidelines for repair, renovation and restoration of water bodies with external assistance


    4. Implementation of the Scheme:

    4.1 Arrangements at Village/Block Level:

    (i) At the water body level, the scheme is to be implemented either by the local Panchayat or a WUA or a government agency identified by the District Level Implementing Agency.

    (ii) The completion plan of the project will be placed before the Gram Sabha and its cooperation will be solicited for timely completion of the project. The Activity Mapping in relation to the role of Panchayat in the implementation of the scheme is at Annexure II.

    4.2 Arrangements at District Level:
    (i) At the district level, the concerned State Government will identify, and if necessary, promote an Implementation Agency for the scheme which will coordinate the programme. There will be a District Level Implementation and Monitoring Committee (DLI&MC) under the chairmanship of District Collector to decide issues relating to implementation, management,supervision and effectiveness of the project. The Committee shall include district level nodal officer from CGWB.

    (ii) District Magistrates/Collectors will constitute DLI&MCs and get the strategy/perspective plans for implementation of scheme finalized.

    4.3 Arrangements at State Level:

    (i) A State Level Nodal Agency (SLNA) will be identified by the State Government which will be responsible to plan various activities envisaged under the scheme, monitor their implementation, provide guidance to DLIA & DLI&MC and ensure coordination amongst all concerned departments/agencies at the state level.

    (ii) State Government will set up a Project Management Unit (PMU), which will be responsible for project planning, financial management, quality assurance, control and for effective implementation of the project sanctioned under the scheme.

    (iii) The State Government will engage the services of reputed independent agencies such as engineering colleges or reputed NGOs with the concurrence of MoWR to support activities for awareness creation, capacity building, preparation of DPRs, concurrent monitoring and evaluation of the scheme.

    (iv) A Technical Advisory Committee (TAC) will be constituted by the State to techno-economically appraise and approve the DPR. TAC shall also include representatives from Central Water Commission (CWC) and Central Ground Water Board (CGWB).

    4.4 Arrangements at Central Level
    The Ministry of Water Resources will coordinate and monitor the implementation of the scheme with the help of Project Management Unit (PMU) in the Ministry. A flow chart indicating the implementation arrangement is at Annexure-I. The role of the Ministry will be to:

    i. facilitate awareness creation about the scheme among stakeholders,
    ii. monitor the progress under the scheme through periodic reports from the states and field visits.
    iii. provide general guidance to states on all matters relating to the implementation of the scheme.
    iv. provide check lists for preparation of DPR.
    v. consider posing of projects received from the states to World Bank through Ministry of Finance under the scheme.
    vi. get the post implementation evaluation and impact assessment of the projects done.
    vii. provide technical assistance to states through field offices of CWC/CGWB.

  5. #5
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Guidelines for repair, renovation and restoration of water bodies with external assistance - Procedure for Submission of proposals.

    Guidelines for repair, renovation and restoration of water bodies with external assistance

    5. Procedure for Submission of proposals

    (i) In case of Panchayats, the projects are to be prepared and forwarded to the District Planning Committee (DPC) for
    inclusion in the District Plan. The Detailed Project Reports (DPRs), will then be forwarded to District Level Implementation Agency (DLIA) for onward transmission to the State Level Nodal Agency (SLNA).

    (ii) Projects taken up by WUAs and Government Departments are to be prepared in consultation with the Standing Committee of Gram Panchayats on Water Resources and the DPRs thereof are to be forwarded to DLIA for onward transmission to SLNA. A copy of the Projects is to be sent also to the DPC.

    (iii) After approval of the DPR by state TAC, the States will submit DPRs to the Ministry of Water Resources, which in turn will take further necessary action for posing it to the World Bank through Department of Economic Affairs, Ministry of Finance under the scheme.

    (iv) The check list for processing of proposal by the MoWR, Government of India is enclosed as Annexure- III.

    (v) The projects already approved by state TAC and posed to World Bank and Government of India for release of funds will also get covered under the scheme.

  6. #6
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Guidelines for repair, renovation and restoration of water bodies with external assistance - Release of funds.

    Guidelines for repair, renovation and restoration of water bodies with external assistance

    6. Release of funds:

    After obtaining clearance from World Bank, Disbursement Claims are to be submitted to the Controller of Aid, Accounts and Auditing (CAAA) of the Department of Economic Affairs, Ministry of Finance with a copy to Ministry of Water Resources for further necessary action in relation to release. Physical Progress Report is also to be sent to MoWR alongwith disbursement claim.

  7. #7
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Guidelines for repair, renovation and restoration of water bodies with external assistance - Monitoring and Evaluation.

    Guidelines for repair, renovation and restoration of water bodies with external assistance

    7. Monitoring and Evaluation:


    (i) Regular monitoring of the project is to be carried out at each stage.Monitoring has to include the maintaining of both physical and financial progress and the outcome. Monitoring will be done with the association of the standing committee of the Panchayat at the appropriate level.

    (ii) Baseline survey is to be conducted before the commencement of the project execution. Evaluation and impact assessment of the scheme will be done by independent agencies to be identified by the Ministry of Water Resources. Necessary reports and field visits are to be made on regular basis for the purpose.

  8. #8
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Guidelines for repair, renovation and restoration of water bodies with external assistance - Annexure - 1 - Implementation Arrangements.

    Guidelines for repair, renovation and restoration of water bodies with external assistance



    Annexure – I

    IMPLEMENTATION ARRANGEMENTS



    For Full Detail You Can Download This From PDF Format
    Attached Files Attached Files

  9. #9
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Guidelines for repair, renovation and restoration of water bodies with external assistance - ANNEXURE-II.

    Guidelines for repair, renovation and restoration of water bodies with external assistance



    ANNEXURE-II

    Activity Mapping in relation to the Role of Panchayats in the Implementation of the Scheme


    For Full Detail You Can Download This From PDF Format

    Attached Files Attached Files

  10. #10
    Super Moderator
    Join Date
    Mar 2010
    Location
    NEW DELHI
    Posts
    6,224

    Thumbs up Guidelines for repair, renovation and restoration of water bodies with external assistance - Annexure-III.

    Guidelines for repair, renovation and restoration of water bodies with external assistance



    Annexure-III

    The Check List for processing the release of funds by the Ministry of Water Resources


    For Full Detail You Can Download This From PDF Format

    Attached Files Attached Files

Tags for this Thread

Bookmarks

Posting Permissions

  • Register / Login to post new threads
  • Register / Login to post replies
  • Register / Login to post attachments
  • You may not edit your posts
  •